Close Menu
The Reporters
  • Home
  • News
  • Politics
  • Crime
  • Health
  • Features
  • Economy
  • Environment
  • Entertainment
  • Business
  • Technology
  • Education
  • Sports
  • Tourism
  • Judiciary
  • Judiciary
  • Foreign
  • Agriculture
  • Religion
  • Weather
  • Banking
  • Labour
  • Faith
  • Advertisment
Facebook X (Twitter) Instagram
  • Home
  • Lifestyle
  • Travel
  • Buy Now
Facebook X (Twitter) Instagram Pinterest Vimeo
The Reporters
  • Home
  • News
  • Politics
  • Crime
  • Health
  • Features
  • Economy
  • Environment
  • Entertainment
  • Business
  • Technology
  • Education
  • Sports
  • Tourism
  • Judiciary
  • Judiciary
  • Foreign
  • Agriculture
  • Religion
  • Weather
  • Banking
  • Labour
  • Faith
  • Advertisment
Subscribe
The Reporters
Environment

3rd Mainland Bridge shut for 3-days-Govt

AdminBy AdminJanuary 28, 2021Updated:January 30, 2021No Comments2 Mins Read
Spread the love

Lagos

The Third Mainland Bridge has been be closed to enable completion of repair works on its double sized expansion, Lagos State Government has said.

The Commissioner for Transportation, Dr Frederic Oladehide,who stated this in a statement in Lagos on Thursday said the facility would be totally closed to all traffic from Saturday till midnight Monday.

The closure, he added, became necessary to enable completion of the repair without any interruption that could be caused by vehicular movement on the bridge.

The commissione said the bridge repaired work was done assiduously to ensure that the set deadlines for reopening the entire bridge was met.

He, however, assured that alternative routes had been identified for use by motorists to access their desired destinations with minimal discomfort.

He, therefore, urged motorists from Ogudu, Alapere and Gbagada to use Ikorodu Road, Jibowu and Yaba as alternative routes.

Those from Iyana Oworosoki bound traffic from the Lagos Island, Iddo, Oyingbo, Adekunle and Yaba, he added, should use Herbert Macaulay Way, Jibowu and Ikorodu road as alternative routes.

“The Traffic Management Personnel will as expected be deployed and stationed along the affected routes to minimise and address any traffic impediments during the closure,” Oladeinde said.

The Commissioner, however, appealed to members of public to cooperate with the state government to ensure improved mobility and free flow of traffic on the roads.

The Reporters recalls that the bridge, which measures about 11.8 km in length, was built by Julius Berger Nigeria PLC and opened by President Ibrahim Babangida in 1990.

Visited 4 times, 1 visit(s) today
Previous ArticleFRSC arrest 3,187 drivers in Lagos for allegedly committing 3,708 offences in 1 month
Next Article Monarch laments insecurity in Okunland
Admin

Related Posts

Governor Ododo Unveils Mining Equipment as Kogi Secures 15 Mining Licenses

April 12, 2025

FG Targets Port Integration Through Road, Rail, Waterways

April 10, 2025

Nasarawa Govt Intensifies Efforts to Prevent Flooding

March 29, 2025

Leave A Reply Cancel Reply

Recent Posts
  • Stay Spiritually,Physically Prepared: NAHCON Urges Nigerian Pilgrims to Makkah.
  • Benue, Rexzodeneh Group Partner to Build Food City in Otukpo
  • KOSSIPA Boss Finally Appears Before Kogi Assembly, Warned to Abide by Law
  • Kogi Shines on Ethics Index as Governor Ododo’s Media Aide Honoured with National Integrity Award
  • Kogi First Lady Reaches Out with Palliatives to Women in Kogi East, Rallies Support for APC
© 2025 The Reporters. Designed by Domo Tech Media .
  • Home
  • Contact Us
  • About Us
  • Posts
  • Privacy Policy

Type above and press Enter to search. Press Esc to cancel.